Friday 29 September 2017

Almost there...

... the garage and workshop roof rafters are in position... some more stonework needed to finish off the walls and the parapets

Monday 25 September 2017

Concrete and Steel

The roof is now formed for the lower (guest) bedroom block just insulation and eventually grass to add.

Friday 22 September 2017

Everything has changed...

... the subterranean steels arrived and are now erected together with the steel sheeting and reinforcement for the roof. Next stage is to pour the concrete and seal the roof.

Thursday 7 September 2017

Moving on...

... but not many changes to see, the garage is probably three quarters built, the subterranean is now back filled to roof level and the block and beam floor is finished....

Tuesday 5 September 2017

Ride on time...

Today our new John Deere ride on tractor mower was delivered and put to work immediately, grass was getting so long but now looks neat and tidy, hedges also trimmed and hedgerows strimmed.