Friday 28 July 2017

Construction commences

Yes today the concrete floor gets poured for the subterranean block which will be 2 bedrooms, bathroom and plant room. 4 lorries of ready mix (40 tons) and a concrete pump.

Reinforced floor
Concrete pump arrives
Overseen by the site managers!
1st lorry load of concrete
3rd lorry load
Getting it level
Finished