Thursday, 20 July 2017

Look no wires...

All gone underground and at a cost... that view is literally worth thousands. Notice the big mound of earth and the big hole that it came from... rain stopped play today but will finish leveling the foundations out on Monday.

Wednesday, 19 July 2017

Tuesday, 18 July 2017

Electricity is coming...

...or rather it is going underground through the site ... 2 new poles put up on the site boundaries ready for connection.

Monday, 17 July 2017

The big dig... commences

To create the subterranean part of the extension the ground needs to be dug to a depth of 4 meters, which means removing over 500 ton of soil... down to over 2 meters today...

Saturday, 15 July 2017

More demolished

The long extension from the cottage added in the 1960's has gone...

Friday, 14 July 2017

Gretal arrives

Our new Gypsy Caravan arrived but due to its size had to be unloaded in Abbey Terrace car park in Winchcombe... and our neighbour Duncan came to the rescue lending his tractor to tow it down Vineyard Street to Lane's Cottage .... thanks goes to Marc from Fernhills and all of the Coombs team on site especially Andrew, our site manager, who bravely drove the tractor. It took time but from arriving at 7am it was finally in situ at 1pm... every picture tells a story....

Unloading
last 100 yards
Through the gate
Change of tow vehicle for stage 2
Reversing into the woodland
Very slowly moving back 
Nearly there just needs to be aligned
Gretel is home.....

Thursday, 13 July 2017

Ready for delivery

After several months of waiting our gypsy caravan is loaded and ready fro an early morning delivery tomorrow


Wednesday, 12 July 2017

Concrete floor is poured

Floor is leveled ready for construction next week


Tuesday, 11 July 2017

Planning permission granted..

... after over 18 months since our first pre app to amend an existing planning gained in 2013.

For more plans see the Plans tab...


Monday, 10 July 2017

Outbuildings Demolished

Just a pile of rubble
Chicken Shed!